

Critical Path
The engineering journey to Starship and beyond.
Movie · 2026 · 34m · TMDB 10
Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.Read moreHide overview
Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.
Where to watch
US availability. Your selected services appear first.
No US offers on file for this title.
Streaming availability data by JustWatch. Logos identify services and remain their trademarks.
About this title
- Released
- July 10, 2026
- Country
- United States
- Original language
- English
- Collection
- SpaceX Starship Documentary Series
Cast
More like this

Interstellar: Nolan's Odyssey
2014

Titanic: The Digital Resurrection
2025

What We Left Behind: Looking Back at Star Trek: Deep Space Nine
2018

The Director and the Jedi
2018

The Fountainhead
1949

The Skywalker Legacy
2020

The Corporation
2003

The Curious Birth of Benjamin Button
2009

Battlestar Galactica
1978

Mariah Carey's Magical Christmas Special
2020

David Attenborough: A Life on Our Planet
2020

Chaos on the Bridge
2014

Generation Wealth
2018

Secrets of the Force Awakens: A Cinematic Journey
2016

12:01
1993

Star Trek
2009

Sunshine
2007

Last Breath
2025






